Migration readiness summary

Static snapshot · 11/4/2026, 9:16:02 AM · Revision 5249

Scope: All batches · All packages

Summary totals

Total workspacesCompleted workspacesComplete componentsComponent progressBlocked / on-hold workspacesBlocking issues (unique)Components on holdRemaining effort
1402 / 14050 / 5729%16 / 140415357.50 hrs / 44.69 working days

Package 1

Status: Planned · Package due date: Not set

Total workspacesCompleted workspacesComplete componentsComponent progressBlocked / on-hold workspacesBlocking issues (unique)Components on holdRemaining effort
152 / 1546 / 8256%13 / 1541222.00 hrs / 2.75 working days
Package items (15 workspaces)

Workspaces

  • BWing/Historic_supply_consumption_per_dma_extractor.fmw
  • DataRecon/DataRecon_Water_Meter.fmw
  • DataRecon/CSV Dump.fmw
  • DataRecon/CurrentRunMonthToFeatureStore.fmw
  • DataRecon/Dashboard_ETL.fmw
  • DataRecon EAMIPS/Data Recon_IPS_EAM_DASHBOARD.fmw
  • DataRecon/DataRecon_WasteWater_Line.fmw
  • DataRecon/DataRecon_WasteWater_Point.fmw
  • DataRecon/DataRecon_Water_Line.fmw
  • DataRecon/DataRecon_Water_Point.fmw
  • GISData/CheckGISDataToIPS.fmw
  • GISData/PDC_DataOut_CopytoProcessed.fmw
  • IPS/ip_wsl_pmr_nonpmr_archive.fmw
  • IPSRestAPI/ips_aqtype_upsert.fmw
  • IPSRestAPI/ips_drawingno_upsert.fmw

Deployment parameters

  • ADMIN_FME_FLOW_WEB_CONN
  • GISDATA_INTEGRATION_DATAOUT
  • GISDATA_EXCEL_CSV_FOLDER
  • STAGING_SDE_WRITE
  • STAGING_SDE_READ
  • FME_FLOW_RESOURCE_LOGS
  • UN_WASTEWATER_SDE_READ

Open shared issues

Snowflake Pending Connection (James Chio)
Snowflake - Warehouse mapping James Chio to dev

Affects 5 workspaces in this package: BWing/Historic_supply_consumption_per_dma_extractor.fmw; DataRecon/DataRecon_Water_Meter.fmw; DataRecon/DataRecon_WasteWater_Point.fmw; DataRecon/DataRecon_Water_Line.fmw; DataRecon/DataRecon_Water_Point.fmw

Pending UN Portal Feature Service
Pending UN Portal Feature Service Missing FeatureTypes form Staging SDE NOTE: Sups data says AGOL - or is it meant to be Portal

Affects 7 workspaces in this package: DataRecon/DataRecon_Water_Meter.fmw; DataRecon/Dashboard_ETL.fmw; DataRecon/DataRecon_WasteWater_Line.fmw; DataRecon/DataRecon_WasteWater_Point.fmw; DataRecon/DataRecon_Water_Line.fmw; DataRecon/DataRecon_Water_Point.fmw; IPSRestAPI/ips_aqtype_upsert.fmw

Missing Features Staging SDE
Features are missing from sde staging, this is likely due to other processes requiring to retun before hand. Need to talk to Sup, to wokrout order, so we can generate data.

Affects 1 workspaces in this package: DataRecon/CSV Dump.fmw

WORKSPACE MISSING FROM FROM FOLDER
MISSING FROM FOLDER

Affects 1 workspaces in this package: GISData/CheckGISDataToIPS.fmw

Blocked / On hold (13)

BWing/Historic_supply_consumption_per_dma_extractor.fmw

Category: Uncategorised
78% prepared · 7 / 9 required components complete · 1.50 hrs / 0.19 working days remaining
Blocking issues (1)
  • Snowflake Pending Connection (James Chio)

Shared issue details are listed at package level.

1 component on hold
  • New connections
    On hold; no detail recorded.

DataRecon/CSV Dump.fmw

Category: Uncategorised
40% prepared · 2 / 5 required components complete · 1.00 hrs / 0.13 working days remaining
Blocking issues (1)
  • Missing Features Staging SDE

Shared issue details are listed at package level.

DataRecon/CurrentRunMonthToFeatureStore.fmw

Category: DataRecon
Category notes: pending notes from sup.
71% prepared · 5 / 7 required components complete · 0.50 hrs / 0.06 working days remaining
1 component on hold — no open issue linked
  • dev@staging@wsl_fme.sde
    On hold; no detail recorded.

DataRecon/Dashboard_ETL.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 2.00 hrs / 0.25 working days remaining
Blocking issues (1)
  • Pending UN Portal Feature Service

Shared issue details are listed at package level.

2 components on hold
  • FeatureServer
    On hold; no detail recorded.
  • dev@staging@wsl_fme.sde
    On hold; no detail recorded.

DataRecon/DataRecon_WasteWater_Line.fmw

Category: DataRecon
Category notes: Requires UN Data
20% prepared · 1 / 5 required components complete · 2.50 hrs / 0.31 working days remaining
Blocking issues (1)
  • Pending UN Portal Feature Service

Shared issue details are listed at package level.

1 component on hold
  • Publish to FME Flow
    Publishing is manually on hold. Review its status or replace this hold with a linked issue.

DataRecon/DataRecon_WasteWater_Point.fmw

Category: Uncategorised
40% prepared · 2 / 5 required components complete · 2.50 hrs / 0.31 working days remaining
Blocking issues (2)
  • Snowflake Pending Connection (James Chio)
  • Pending UN Portal Feature Service

Shared issue details are listed at package level.

1 component on hold
  • Publish to FME Flow
    Publishing is manually on hold. Review its status or replace this hold with a linked issue.

DataRecon/DataRecon_Water_Line.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining
Blocking issues (2)
  • Snowflake Pending Connection (James Chio)
  • Pending UN Portal Feature Service

Shared issue details are listed at package level.

1 component on hold
  • Publish to FME Flow
    Publishing is manually on hold. Review its status or replace this hold with a linked issue.

DataRecon/DataRecon_Water_Meter.fmw

Category: Uncategorised
75% prepared · 3 / 4 required components complete · 0.50 hrs / 0.06 working days remaining
Blocking issues (2)
  • Pending UN Portal Feature Service
  • Snowflake Pending Connection (James Chio)

Shared issue details are listed at package level.

1 component on hold
  • Publish to FME Flow
    Publishing is manually on hold. Review its status or replace this hold with a linked issue.

DataRecon/DataRecon_Water_Point.fmw

Category: Uncategorised
50% prepared · 3 / 6 required components complete · 2.50 hrs / 0.31 working days remaining
Blocking issues (2)
  • Snowflake Pending Connection (James Chio)
  • Pending UN Portal Feature Service

Shared issue details are listed at package level.

1 component on hold
  • Publish to FME Flow
    Publishing is manually on hold. Review its status or replace this hold with a linked issue.

GISData/CheckGISDataToIPS.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining
Blocking issues (1)
  • WORKSPACE MISSING FROM FROM FOLDER

Shared issue details are listed at package level.

1 component on hold
  • Publish to FME Flow
    Publishing is manually on hold. Review its status or replace this hold with a linked issue.

GISData/PDC_DataOut_CopytoProcessed.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining
1 component on hold — no open issue linked
  • Publish to FME Flow
    Publishing is manually on hold. Review its status or replace this hold with a linked issue.

IPSRestAPI/ips_aqtype_upsert.fmw

Category: Uncategorised
83% prepared · 5 / 6 required components complete · 0.50 hrs / 0.06 working days remaining
Blocking issues (1)
  • Pending UN Portal Feature Service

Shared issue details are listed at package level.

IPSRestAPI/ips_drawingno_upsert.fmw

Category: Uncategorised
75% prepared · 6 / 8 required components complete · 0.50 hrs / 0.06 working days remaining
1 component on hold — no open issue linked
  • dev@unwwater@wsl_fme.sde
    On hold; no detail recorded.

Pending / In progress (0)

No workspaces in this group.

Complete (2)

DataRecon EAMIPS/Data Recon_IPS_EAM_DASHBOARD.fmw

Category: DataRecon
Category notes: Associated with EAMIPS
100% prepared · 8 / 8 required components complete · 0.00 hrs / 0.00 working days remaining

No active blockers.

IPS/ip_wsl_pmr_nonpmr_archive.fmw

Category: Uncategorised
100% prepared · 4 / 4 required components complete · 0.00 hrs / 0.00 working days remaining

No active blockers.

package 2

Status: Planned · Package due date: Not set

Total workspacesCompleted workspacesComplete componentsComponent progressBlocked / on-hold workspacesBlocking issues (unique)Components on holdRemaining effort
100 / 104 / 3312%3 / 100315.50 hrs / 1.94 working days
Package items (10 workspaces)

Workspaces

  • BWing/tpw_wwmodel_publishToQA_v16_qa.fmw
  • GISData/CheckTodayCountW.fmw
  • GISData/GISDataToIPSEmail.fmw
  • GISData/NZVD2016_Convert.fmw
  • Test/ChatBot_SM_Aggregator.fmw
  • Test/XLStoAGOL_FMESERVER.fmw
  • Test/snowflake_nonspatial2csv2.fmw
  • GISData/ProposedProjects_LNUpdate.fmw
  • ACWeekly/ACWeekly_DateCheck_v1.fmw
  • Test/Snowflake_Test.fmw

Deployment parameters

  • shapefiles
  • svc_agol
  • GISDATA_EXCEL_CSV_FOLDER

Blocked / On hold (3)

GISData/CheckTodayCountW.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining
1 component on hold — no open issue linked
  • Publish to FME Flow
    Publishing is manually on hold. Review its status or replace this hold with a linked issue.

GISData/GISDataToIPSEmail.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining
1 component on hold — no open issue linked
  • Publish to FME Flow
    Publishing is manually on hold. Review its status or replace this hold with a linked issue.

GISData/NZVD2016_Convert.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 2.00 hrs / 0.25 working days remaining
1 component on hold — no open issue linked
  • Publish to FME Flow
    Publishing is manually on hold. Review its status or replace this hold with a linked issue.

Pending / In progress (7)

ACWeekly/ACWeekly_DateCheck_v1.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

BWing/tpw_wwmodel_publishToQA_v16_qa.fmw

Category: Uncategorised
50% prepared · 2 / 4 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

GISData/ProposedProjects_LNUpdate.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

Test/ChatBot_SM_Aggregator.fmw

Category: Uncategorised
40% prepared · 2 / 5 required components complete · 1.50 hrs / 0.19 working days remaining

No active blockers.

Test/snowflake_nonspatial2csv2.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

Test/Snowflake_Test.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

Test/XLStoAGOL_FMESERVER.fmw

Category: Uncategorised
0% prepared · 0 / 5 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

Complete (0)

No workspaces in this group.

Unassigned workspaces

Status: Unassigned · Package due date: —

Total workspacesCompleted workspacesComplete componentsComponent progressBlocked / on-hold workspacesBlocking issues (unique)Components on holdRemaining effort
1150 / 1150 / 4570%0 / 11500320.00 hrs / 40.00 working days
Package items (115 workspaces)

Workspaces

  • ACWeekly/datain_acweekly_ext_fgdb.fmw
  • ACWeekly/datain_acweekly_int_fgdb.fmw
  • ACWeekly/datain_acweekly_sde_master.fmw
  • DataINACMonthly/Prod_InACMonthly.fmw
  • DataINACQuarterly/Prod_InACQuarterly.fmw
  • AddressLocator/AddressLocator_Geocode.fmw
  • AssetDrillBack/AssetPRODload.fmw
  • AssetDrillBack/ProjectwiseTablePRODLoad.fmw
  • BWing/DMA_Dissolve.fmw
  • BWing/generate_nrw_dma_layer_snowflake_prod.fmw
  • Planning And Insights/TPWWastewaterModelPublishToProd.fmw
  • Planning And Insights/TPWWaterModelPublishToProd.fmw
  • BWing/at_load_gis_addrkey_prd_v1.fmw
  • BWing/at_load_gis_assets_prd_v1.fmw
  • BWing/at_load_gis_assets_prd_v2.fmw
  • BWing/at_load_gis_assets_prd_v3.fmw
  • BWing/at_load_gis_connections_prd_v1.fmw
  • BWing/at_load_gis_external_asset_prd_v2.fmw
  • BWing/at_load_gis_facility_prd_v1.fmw
  • BWing/at_load_gis_keycustomer_prd_v1.fmw
  • BWing/at_load_gis_external_asset_prd_v1.fmw
  • BWing/tpw_wmodel_publishToQA.fmw
  • Planning And Insights/TPWWastewaterModelPublishToQA.fmw
  • Planning And Insights/TPWWaterModelPublishToQA.fmw
  • BWing/prod_metersummary_fault_v1.fmw
  • BWing/prod_metersummary_v1.fmw
  • BWing/prod_pipesummary_fault_v1.fmw
  • BWing/prod_pipesummary_v1.fmw
  • WaterLake/keycustomer_redshift.fmw
  • BWing/tpw_as_meter_category_snowflake_prod.fmw
  • BWing/tpw_as_meter_fault_summary_snowflake_prod.fmw
  • BWing/tpw_as_pipe_category_snowflake_prod.fmw
  • BWing/tpw_as_pipe_fault_summary_snowflake_prod.fmw
  • Test/DMA_GIS_UNITID_FME_SERVER.fmw
  • WaterLake/keycustomer_snowflake.fmw
  • BWing/tpw_as_meter_category_snowflake_staging.fmw
  • BWing/tpw_as_pipe_category_snowflake_staging.fmw
  • BWing/tpw_as_pipe_fault_summary_snowflake_staging.fmw
  • BWing/tpw_as_meter_category_v2_prd.fmw
  • BWing/tpw_as_meter_fault_summary_v2_prd.fmw
  • BWing/tpw_as_pipe_category_v2_prd.fmw
  • BWing/tpw_as_pipe_fault_summary_v2_prd.fmw
  • DataOut/ACDaily.fmw
  • DataOut/BeforeUdig.fmw
  • DataOut/BeforeUdig_fix.fmw
  • DataOut/Contractors_Weekly.fmw
  • DataOut/FWVMonthlyDataOut.fmw
  • DataRecon EAMIPS/Data Recon_IPS_EAM_Mains.fmw
  • DataRecon EAMIPS/Data Recon_IPS_EAM_NetworkAssets.fmw
  • DataRecon EAMIPS/Data Recon_IPS_EAM_Others_Agencysimple.fmw
  • DataRecon EAMIPS/Data Recon_IPS_EAM_WaterMeters.fmw
  • DataRecon/Data Recon_IPS_EAM_Others_Agencysimple.fmw
  • GISData/ACWeeklyToGISStaging.fmw
  • GISData/BaseDataMonthly.fmw
  • GISData/BaseDataMonthly_API.fmw
  • GISData/BaseDataWeekly.fmw
  • GISData/BaseDataWeekly_API.fmw
  • GISData/CheckGISData.fmw
  • GISData/CheckTodayCountWW.fmw
  • GISData/CopyProdMasterToGDB.fmw
  • GISData/CopyProdMasterToGDB_Friday.fmw
  • GISData/CopyProdMasterToGDB_Monday.fmw
  • GISData/CopyProdMasterToGDB_Sunday.fmw
  • GISData/CopyProdMasterToGDB_Thursday.fmw
  • GISData/CopyProdMasterToGDB_Tuesday.fmw
  • GISData/CopyProdMasterToGDB_Wednesday.fmw
  • GISData/FindWhoDeletedAssetW.fmw
  • GISData/FindWhoDeletedAssetWW.fmw
  • GISData/NZVD_Extract_Schedule.fmw
  • GISData/NZVD_TruncateConvertGDB.fmw
  • GISData/NZVD_Investigate_Email.fmw
  • GISData/NZVD_Staging.fmw
  • GISData/NZVD_TruncateStaging.fmw
  • GISData/PDC_DataOut.fmw
  • GISData/StackedPointsSendEmails.fmw
  • IPS/Tradewaste_Attributes_Update_PROD.fmw
  • IPS/ip_address.fmw
  • IPS/ip_addressreconciliation.fmw
  • IPS/ip_connections.fmw
  • IPS/ip_hawkeye.fmw
  • IPS/ip_hydrantpainting.fmw
  • IPS/ip_leaks.fmw
  • IPS/ip_watermainbreaks.fmw
  • IPS/ip_waterqualityjobs.fmw
  • Test/ip_watermainbreaks_intrim_v1.fmw
  • IPS/ip_keycustomer.fmw
  • IPS/ip_service_request_load.fmw
  • IPS/ip_wsl_pmr_nonpmr.fmw
  • IPS/wsl_newmeters.fmw
  • IPS/ip_wsl_pmrtag.fmw
  • IPS/ip_wsl_pmrtag_v2.fmw
  • IPSRestAPI/ips_projectref_upsert.fmw
  • Overflows/Overflow_FDEN_FDOF_FDWR_Address_Repeat.fmw
  • Overflows/PROD_OverflowFDOpenLayers.fmw
  • Planning And Insights/Consumption_Report.fmw
  • Shapefiles/shp_base_stormwater.fmw
  • Shapefiles/shp_other.fmw
  • Shapefiles/shp_planning.fmw
  • Shapefiles/shp_water_ww.fmw
  • Shapefiles/shp_zones_catchments_boundaries.fmw
  • Test/OpenAI_Arconym_WSLVersion.fmw
  • Test/OpenAI_ErrorMessage_WSLVersion.fmw
  • VehicleETL/fleet_vehicle_locations.fmw
  • WaterLake/addresses_postgres.fmw
  • ACWeekly/datain_acweekly_count_validation.fmw
  • Overflow/Overflow_Dashboard_Customer_Management_Data.fmw
  • Condition Network Assets/DataExtractWaterDashboard_W_Hydrants.fmw
  • Condition Network Assets/DataExtractWaterDashboard_WValve.fmw
  • Test/FME_SERVER_AUTHORINGV2.fmw
  • New workspace
  • DataINACMonthly/Prod_CopyACMonthly.fmw
  • DataINACQuarterly/Prod_CopyACQuarterly.fmw
  • ACWeeky/datain_acweekly_addrloc_rebuild,fmw
  • ACWeekly/datain_acweekly_copy.fmw
  • ACWeekly/datain_acweekly_count_validation.fmw

Deployment parameters

  • shapefiles
  • GISDATA_EXCEL_CSV_FOLDER
  • ADMIN_FME_FLOW_WEB_CONN
  • FME_FLOW_RESOURCE_LOGS
  • svc_agol

Blocked / On hold (0)

No workspaces in this group.

Pending / In progress (115)

ACWeekly/datain_acweekly_copy.fmw

Category: Uncategorised
0% prepared · 0 / 1 required components complete · 0.00 hrs / 0.00 working days remaining

No active blockers.

ACWeekly/datain_acweekly_count_validation.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

ACWeekly/datain_acweekly_count_validation.fmw

Category: Uncategorised
0% prepared · 0 / 1 required components complete · 0.00 hrs / 0.00 working days remaining

No active blockers.

ACWeekly/datain_acweekly_ext_fgdb.fmw

Category: Uncategorised
0% prepared · 0 / 5 required components complete · 4.00 hrs / 0.50 working days remaining

No active blockers.

ACWeekly/datain_acweekly_int_fgdb.fmw

Category: Uncategorised
0% prepared · 0 / 5 required components complete · 4.00 hrs / 0.50 working days remaining

No active blockers.

ACWeekly/datain_acweekly_sde_master.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

ACWeeky/datain_acweekly_addrloc_rebuild,fmw

Category: Uncategorised
0% prepared · 0 / 1 required components complete · 0.00 hrs / 0.00 working days remaining

No active blockers.

AddressLocator/AddressLocator_Geocode.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

AssetDrillBack/AssetPRODload.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

AssetDrillBack/ProjectwiseTablePRODLoad.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

BWing/at_load_gis_addrkey_prd_v1.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

BWing/at_load_gis_assets_prd_v1.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

BWing/at_load_gis_assets_prd_v2.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

BWing/at_load_gis_assets_prd_v3.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

BWing/at_load_gis_connections_prd_v1.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

BWing/at_load_gis_external_asset_prd_v1.fmw

Category: Uncategorised
0% prepared · 0 / 7 required components complete · 6.00 hrs / 0.75 working days remaining

No active blockers.

BWing/at_load_gis_external_asset_prd_v2.fmw

Category: Uncategorised
0% prepared · 0 / 7 required components complete · 6.00 hrs / 0.75 working days remaining

No active blockers.

BWing/at_load_gis_facility_prd_v1.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

BWing/at_load_gis_keycustomer_prd_v1.fmw

Category: Uncategorised
0% prepared · 0 / 5 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

BWing/DMA_Dissolve.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

BWing/generate_nrw_dma_layer_snowflake_prod.fmw

Category: Uncategorised
0% prepared · 0 / 5 required components complete · 4.00 hrs / 0.50 working days remaining

No active blockers.

BWing/prod_metersummary_fault_v1.fmw

Category: Uncategorised
0% prepared · 0 / 8 required components complete · 7.00 hrs / 0.88 working days remaining

No active blockers.

BWing/prod_metersummary_v1.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

BWing/prod_pipesummary_fault_v1.fmw

Category: Uncategorised
0% prepared · 0 / 6 required components complete · 5.00 hrs / 0.63 working days remaining

No active blockers.

BWing/prod_pipesummary_v1.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

BWing/tpw_as_meter_category_snowflake_prod.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

BWing/tpw_as_meter_category_snowflake_staging.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

BWing/tpw_as_meter_category_v2_prd.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

BWing/tpw_as_meter_fault_summary_snowflake_prod.fmw

Category: Uncategorised
0% prepared · 0 / 8 required components complete · 6.00 hrs / 0.75 working days remaining

No active blockers.

BWing/tpw_as_meter_fault_summary_v2_prd.fmw

Category: Uncategorised
0% prepared · 0 / 8 required components complete · 6.00 hrs / 0.75 working days remaining

No active blockers.

BWing/tpw_as_pipe_category_snowflake_prod.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

BWing/tpw_as_pipe_category_snowflake_staging.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

BWing/tpw_as_pipe_category_v2_prd.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

BWing/tpw_as_pipe_fault_summary_snowflake_prod.fmw

Category: Uncategorised
0% prepared · 0 / 6 required components complete · 4.00 hrs / 0.50 working days remaining

No active blockers.

BWing/tpw_as_pipe_fault_summary_snowflake_staging.fmw

Category: Uncategorised
0% prepared · 0 / 6 required components complete · 4.00 hrs / 0.50 working days remaining

No active blockers.

BWing/tpw_as_pipe_fault_summary_v2_prd.fmw

Category: Uncategorised
0% prepared · 0 / 6 required components complete · 4.00 hrs / 0.50 working days remaining

No active blockers.

BWing/tpw_wmodel_publishToQA.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

Condition Network Assets/DataExtractWaterDashboard_W_Hydrants.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

Condition Network Assets/DataExtractWaterDashboard_WValve.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

DataINACMonthly/Prod_CopyACMonthly.fmw

Category: Uncategorised
0% prepared · 0 / 1 required components complete · 0.00 hrs / 0.00 working days remaining

No active blockers.

DataINACMonthly/Prod_InACMonthly.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

DataINACQuarterly/Prod_CopyACQuarterly.fmw

Category: Uncategorised
0% prepared · 0 / 1 required components complete · 0.00 hrs / 0.00 working days remaining

No active blockers.

DataINACQuarterly/Prod_InACQuarterly.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

DataOut/ACDaily.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

DataOut/BeforeUdig_fix.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

DataOut/BeforeUdig.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

DataOut/Contractors_Weekly.fmw

Category: Uncategorised
0% prepared · 0 / 7 required components complete · 6.00 hrs / 0.75 working days remaining

No active blockers.

DataOut/FWVMonthlyDataOut.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

DataRecon EAMIPS/Data Recon_IPS_EAM_Mains.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

DataRecon EAMIPS/Data Recon_IPS_EAM_NetworkAssets.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

DataRecon EAMIPS/Data Recon_IPS_EAM_Others_Agencysimple.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

DataRecon EAMIPS/Data Recon_IPS_EAM_WaterMeters.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

DataRecon/Data Recon_IPS_EAM_Others_Agencysimple.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

GISData/ACWeeklyToGISStaging.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

GISData/BaseDataMonthly_API.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

GISData/BaseDataMonthly.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

GISData/BaseDataWeekly_API.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

GISData/BaseDataWeekly.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

GISData/CheckGISData.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

GISData/CheckTodayCountWW.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

GISData/CopyProdMasterToGDB_Friday.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

GISData/CopyProdMasterToGDB_Monday.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

GISData/CopyProdMasterToGDB_Sunday.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

GISData/CopyProdMasterToGDB_Thursday.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

GISData/CopyProdMasterToGDB_Tuesday.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

GISData/CopyProdMasterToGDB_Wednesday.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

GISData/CopyProdMasterToGDB.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

GISData/FindWhoDeletedAssetW.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

GISData/FindWhoDeletedAssetWW.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

GISData/NZVD_Extract_Schedule.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

GISData/NZVD_Investigate_Email.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

GISData/NZVD_Staging.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

GISData/NZVD_TruncateConvertGDB.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

GISData/NZVD_TruncateStaging.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

GISData/PDC_DataOut.fmw

Category: Uncategorised
0% prepared · 0 / 7 required components complete · 6.00 hrs / 0.75 working days remaining

No active blockers.

GISData/StackedPointsSendEmails.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

IPS/ip_address.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

IPS/ip_addressreconciliation.fmw

Category: Uncategorised
0% prepared · 0 / 6 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

IPS/ip_connections.fmw

Category: Uncategorised
0% prepared · 0 / 9 required components complete · 6.00 hrs / 0.75 working days remaining

No active blockers.

IPS/ip_hawkeye.fmw

Category: Uncategorised
0% prepared · 0 / 8 required components complete · 7.00 hrs / 0.88 working days remaining

No active blockers.

IPS/ip_hydrantpainting.fmw

Category: Uncategorised
0% prepared · 0 / 6 required components complete · 5.00 hrs / 0.63 working days remaining

No active blockers.

IPS/ip_keycustomer.fmw

Category: Uncategorised
0% prepared · 0 / 8 required components complete · 5.00 hrs / 0.63 working days remaining

No active blockers.

IPS/ip_leaks.fmw

Category: Uncategorised
0% prepared · 0 / 6 required components complete · 5.00 hrs / 0.63 working days remaining

No active blockers.

IPS/ip_service_request_load.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

IPS/ip_watermainbreaks.fmw

Category: Uncategorised
0% prepared · 0 / 6 required components complete · 5.00 hrs / 0.63 working days remaining

No active blockers.

IPS/ip_waterqualityjobs.fmw

Category: Uncategorised
0% prepared · 0 / 6 required components complete · 5.00 hrs / 0.63 working days remaining

No active blockers.

IPS/ip_wsl_pmr_nonpmr.fmw

Category: Uncategorised
0% prepared · 0 / 5 required components complete · 4.00 hrs / 0.50 working days remaining

No active blockers.

IPS/ip_wsl_pmrtag_v2.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

IPS/ip_wsl_pmrtag.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

IPS/Tradewaste_Attributes_Update_PROD.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

IPS/wsl_newmeters.fmw

Category: Uncategorised
0% prepared · 0 / 5 required components complete · 4.00 hrs / 0.50 working days remaining

No active blockers.

IPSRestAPI/ips_projectref_upsert.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

New workspace

Category: Uncategorised
0% prepared · 0 / 1 required components complete · 0.00 hrs / 0.00 working days remaining

No active blockers.

Overflow/Overflow_Dashboard_Customer_Management_Data.fmw

Category: Uncategorised
0% prepared · 0 / 6 required components complete · 4.00 hrs / 0.50 working days remaining

No active blockers.

Overflows/Overflow_FDEN_FDOF_FDWR_Address_Repeat.fmw

Category: Uncategorised
0% prepared · 0 / 9 required components complete · 7.00 hrs / 0.88 working days remaining

No active blockers.

Overflows/PROD_OverflowFDOpenLayers.fmw

Category: Uncategorised
0% prepared · 0 / 11 required components complete · 9.00 hrs / 1.13 working days remaining

No active blockers.

Planning And Insights/Consumption_Report.fmw

Category: Uncategorised
0% prepared · 0 / 7 required components complete · 5.00 hrs / 0.63 working days remaining

No active blockers.

Planning And Insights/TPWWastewaterModelPublishToProd.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

Planning And Insights/TPWWastewaterModelPublishToQA.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

Planning And Insights/TPWWaterModelPublishToProd.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

Planning And Insights/TPWWaterModelPublishToQA.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

Shapefiles/shp_base_stormwater.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

Shapefiles/shp_other.fmw

Category: Uncategorised
0% prepared · 0 / 5 required components complete · 4.00 hrs / 0.50 working days remaining

No active blockers.

Shapefiles/shp_planning.fmw

Category: Uncategorised
0% prepared · 0 / 6 required components complete · 5.00 hrs / 0.63 working days remaining

No active blockers.

Shapefiles/shp_water_ww.fmw

Category: Uncategorised
0% prepared · 0 / 5 required components complete · 4.00 hrs / 0.50 working days remaining

No active blockers.

Shapefiles/shp_zones_catchments_boundaries.fmw

Category: Uncategorised
0% prepared · 0 / 6 required components complete · 5.00 hrs / 0.63 working days remaining

No active blockers.

Test/DMA_GIS_UNITID_FME_SERVER.fmw

Category: Uncategorised
0% prepared · 0 / 5 required components complete · 4.00 hrs / 0.50 working days remaining

No active blockers.

Test/FME_SERVER_AUTHORINGV2.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

Test/ip_watermainbreaks_intrim_v1.fmw

Category: Uncategorised
0% prepared · 0 / 6 required components complete · 4.00 hrs / 0.50 working days remaining

No active blockers.

Test/OpenAI_Arconym_WSLVersion.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

Test/OpenAI_ErrorMessage_WSLVersion.fmw

Category: Uncategorised
0% prepared · 0 / 2 required components complete · 1.00 hrs / 0.13 working days remaining

No active blockers.

VehicleETL/fleet_vehicle_locations.fmw

Category: Uncategorised
0% prepared · 0 / 3 required components complete · 2.00 hrs / 0.25 working days remaining

No active blockers.

WaterLake/addresses_postgres.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

WaterLake/keycustomer_redshift.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

WaterLake/keycustomer_snowflake.fmw

Category: Uncategorised
0% prepared · 0 / 4 required components complete · 3.00 hrs / 0.38 working days remaining

No active blockers.

Complete (0)

No workspaces in this group.

A workspace is fully completed when every required tracked component is complete, including publishing to FME Flow, and it has no active blockers. Completed and blocked workspace counts use the total number of workspaces as their denominator. Each blocked workspace is counted once, even when it has several blockers. Component progress is completed required components divided by all required components. Legacy and optional items are excluded from blockers and effort. Effort allows 30 minutes per reader, 30 minutes per writer and 30 minutes for parameter work; completed work reduces the estimate. One working day equals 8 hours. On-hold work remains in the remaining effort estimate. This report is a static snapshot and contains no editable dashboard or recovery data.